![Case study three - Primary - Case study - Dental health centre - HERO IMAGE](https://www.isgltd.com/-/media/images/isg/landing-pages/project/herobanner/case-study-three---primary---case-study---dental-health-centre---hero-image---exterior-02.jpg?h=400&w=1560&hash=A6FB63082829317104298BCB54275E2E&usecustomfunctions=1¢ercrop=1 )
-
- Customer
- Langman Associates
-
- Completion Date
- February 2013
-
- Value
- £2.0m
![Dental health Centre](https://www.isgltd.com/-/media/images/isg/components/mediasection/image/dental_health_centre_band_one.jpg?h=328&w=512&hash=84474C76C6D856EC0CA8A9BFE30B317E&usecustomfunctions=1¢ercrop=1 )
Introduction
This mixed-use project was for the refurbishment of the historic Ely Place to create a high-specification dental health centre and a church. It included the demolition of an earlier extension and the construction of two new extensions.
Ely Place is a Grade II listed town house which includes elements that date back to the 17th Century and it was previously used solely as a church.
The Project
Within the existing building ISG renovated and reconfigured the accommodation to deliver a spacious waiting area, dental hygienists’ facilities and an oral health education centre. Further surgery rooms are located at first floor level as well as staff facilities.
ISG constructed a part two-storey steel frame structure to the side and rear of the townhouse. The extension houses surgery and consultation rooms, offices, a reception, welfare facilities and a laboratory. A basement was formed to house the mechanical & electrical services.
The façade of Ely Place was sensitively restored, including repairing the masonry and roof, restoring windows and repainting the facing brickwork.
ISG also built a two-storey structure to provide modern accommodation for worshippers, including an auditorium, bookshop, classrooms, nursery and study room.