Project

Tseung Kwan O Datacentre

Within Tseung Kwan O datacentre, ISG fitted out two new data halls spanning 20,000 sq ft including the installation of raised floor system.
  • Customer
    BYME Engineering Limited
  • Completion Date
    September 2014
  • Quantity Surveyor
    Turner & Townsend Brechin
  • Value
    $21,000,000
  • Form Of Contract
    Sub contractor
  • Project Manager
    Faithful+Gould
  • Area
    20,000 sq ft
  • Program Duration
    26 weeks
  • Architect
    Studio One
  • ME Engineer
    DSCO Group
TKO datacentre_band image2

Overview

Within Tseung Kwan O datacentre, ISG fitted out two new data halls spanning 20,000 sq. ft. including the installation of raised floor system. Apart from the fit out delivery, ISG also supplied and installed over 300 tonnes of structural steel on the rooftop to support the critical plant infrastructure of Digital Savvis HKG10 expansion project. Special considerations and detailed logistic planning were required, especially for the delivery of steel structures to the rooftop and within a live datacentre environment.