Wakefield One office fit out - West Yorkshire - ISG
Project

Wakefield One

Bringing Wakefield One online with a 21st century fit out
  • Customer
    Wakefield Metropolitan District Council
  • Procurement Route
    Single stage
  • Completion Date
    October 2012
  • Quantity Surveyor
    NPS Group
  • Value
    £1.94m
  • Form Of Contract
    NEC Engineering and Construction Contract (June 2005) with amendments Option A
  • Project Manager
    NPS Group
  • Structural Engineer
    NPS Group
  • Area
    158,639 sq ft
  • Program Duration
    On site (40 week contract period)
  • Architect
    NPS Group
  • ME Engineer
    NPS Group
Inner atrium of Wakefield One office fit out in Yorkshire delivered by ISG Ltd

Introduction

Wakefield One saw ISG deliver a fast-track, phased programme to ensure 1,200 council employees could hit the ground running as soon as they moved into their new offices.

Every person in the building now benefits from a minimum of 10GB connection speed, with individual power banks and superior soundproofing in the interview and meeting rooms.

Thanks to the high quality of our work on the Cat B fit out, we were awarded the contract to deliver a new café facility on the ground floor.

Wakefield One office fit out - Yorkshire - ISG - What we did

The project

We were tasked with delivering the electrical and IT systems to ensure the new office was fit for the 21st century.

This included installing a new electrical bus bar and CAT6A data cabling distribution in the underfloor void to user workstations across five floors.

We also carried out the construction of individual office spaces, meeting and interview rooms, and break out areas, with final decorations and floor finishes bringing the final product together.

To overcome the challenges on the programme, we worked closely with the council, accommodating other contractors and creating several office entrances to ensure that employees moving into the upper floors were not disturbed by the work below.

Wakefield One office fit out - Yorkshire - ISG - Challenges

Added value

As the main fit out contractor on the tight programme, we had to work closely with other contractors on site delivering desks, furniture, workstations and soft furnishings.

This was made even more challenging once the phased handover started on the upper floors as we continued to work on the lower levels.

Street facade of Wakefield One office fit out in Yorkshire delivered by ISG Ltd

Sustainability

Sustainable materials were used where possible and 90 per cent of all site waste was recycled. A high percentage of suppliers and sub-contractors were based within a 30-mile radius of the site.

On site, car and van sharing was encouraged and we offered three-weeklong work experience placements to local bricklaying and joinery college students. We also supported an apprentice decorator who was working on site for one of our subcontractors.

“Wakefield One has been a very successful project coming in on time and on budget. ISG focus upon the things that matter to clients and that goes well beyond managing schedules and costs into talking and listening to us and ensuring the building is able to meet its aims of transforming service delivery by using space and technology in better ways.”

Andrew Hughes, Worksmart Programme Manager, City of Wakefield Metropolitan District Council