Project

CMS

Winner of the Best Fit Out of Workplace at the British Council for Offices (BCO) 2016.
  • Customer
    CMS
  • Procurement Route
    Lump sum
  • Completion Date
    31 January 2015
  • Quantity Surveyor
    Gardiner & Theobald
  • Project Manager
    Gardiner & Theobald
  • Structural Engineer
    Elliott Wood
  • Area
    160,000 sq ft
  • Program Duration
    24 weeks
  • Architect
    MCM Architecture/KKS
  • ME Engineer
    ChampmanBDSP
CMS legal office fit out

Introduction

ISG’s fit out project for CMS at Cannon Place, London, won the Best Fit Out of Workplace at the British Council for Offices (BCO) London & South East Awards 2016.

CMS fit out London -ISG

The project

One of many logistical challenges involved the manoeuvring of a single 14-metre, three and a half tonne solid steel beam which had to be installed into the building in one piece.

CMS was relocating from their established offices to a new 160,000 sq ft open plan space at Cannon Place.

The project involved installing two feature staircases linking all three floors. On the first floor, the team designed a brand new reception complete with a striking 17th century map of London.

A new staff restaurant was installed on the first floor. The award winning studio-style open plan fit out also included new IT infrastructure.