- Completion Date
- Sep 2021
-
- Quantity Surveyor
- Atkins
-
- Form Of Contract
- Design and Build
-
- Project Manager
- Mace/Jacobs
-
- Structural Engineer
- Hopkins
-
- Area
- 62,000 sq ft
-
- Program Duration
- 20 weeks
-
- Architect
- Roar
-
- ME Engineer
- Bluehaus
![ISG delivers fit out for Expo 2020 Dubai](https://www.isgltd.com/ae/-/media/images/isg/components/mediasection/image/foodhall04_case-study-image_512-x-328.jpg?h=328&w=512&hash=2103578E6D2A5295E2B4245F485947AA&usecustomfunctions=1¢ercrop=1 )
The project
Food Hall 1 boasts a mix of ‘food hall’ dining as well as high end dining. It hosts many one-of-a-kind, attracting features such as ‘chefs table’ seating areas and private areas for a VIP dining experience, as well as a large terrace looking on to the renowned Al Wasl Dome. With a contemporary, clean feel created through soft wooden finishes and lots of greenery using many planters and trees within the venue; it is certainly no ordinary food hall encounter.
![ISG delivers fit out for Expo 2020 Dubai](https://www.isgltd.com/ae/-/media/images/isg/components/mediasection/image/foodhall05_case-study-image_512-x-328.jpg?h=328&w=512&hash=CB4AFF34A477FC77400804A208C9F435&usecustomfunctions=1¢ercrop=1 )
![ISG delivers fit out for Expo 2020 Dubai](https://www.isgltd.com/ae/-/media/images/isg/components/mediasection/image/foodhall01_case-study-image_512-x-328.jpg?h=328&w=512&hash=B2DA167499858B233A323BE07CF70329&usecustomfunctions=1¢ercrop=1 )
![ISG delivers fit out for Expo 2020 Dubai](https://www.isgltd.com/ae/-/media/images/isg/components/mediasection/image/foodhall02_case-study-image_512-x-328.jpg?h=328&w=512&hash=BD5DD22399CF44E720D056C469ADF1E2&usecustomfunctions=1¢ercrop=1 )
Challenges
- Design stage – Concept to Shop drawing
- Unforeseen challenges with the base build contractor during the handover stage.
![ISG delivers fit out for Expo 2020 Dubai](https://www.isgltd.com/ae/-/media/images/isg/components/mediasection/image/foodhall03_case-study-image_512-x-328.jpg?h=328&w=512&hash=7F59FDAB5FFB94C7050DF1096E0E7B55&usecustomfunctions=1¢ercrop=1 )
Solutions delivered
Instead of utilizing the usual technical design stage, the engineering shop drawing period was used to complete the information to a standard which could be procured and installed in advance of the expected programme periods allowing us to maximize productivity on the already challenging programme deadlines.