Case studies

Showing 1-10 of 40

View: Global site All sites Current site

Case Study

The Savoy Grill fit out, London, UK

1 January 0001

Celebrity chef and Michelin Star winner Gordon Ramsay reappointed ISG for circa £600,000 fit out of the Savoy Grill. Located on The Strand, the grill was designed to seat approximately 130 diners in modern comfort without losing any of the charm that the Savoy Grill has long been famous for.

Case Study

Bread Street Kitchen fit out, London, UK

1 January 0001

The multi-million pound, awarding-winning fit out project comprised of the installation of both a lift and a dramatic, 8.5 metre-high feature staircase. We also constructed a blackened steel and brass mesh, which incorporates viewing platforms looking out over the ground floor wine bar.

Case Study

Watches of Switzerland fit out, London, UK

1 January 0001

This was our first project for the Watches of Switzerland in the UK, and it was one ISG was very excited to deliver.

Case Study
Lancaster hotel

Lancaster Hotel refurbishment, London, UK

1 January 0001

The Lancaster refurbishment project was one the most expansive our team has undertaken to date. With sufficient facilities to host 1,800 people across two rooms, it also comprises enough rooms to accommodate over 1,000 people per night.

Case Study
Zetter ISG fit out thumbnail

The Zetter Hotel

1 January 0001

Tasked with a substantial refurbishment of a historic building, our team began transforming the Victorian warehouse building in Clerkenwell into an environmentally friendly boutique hotel demonstrating style, comfort, and personality.

Case Study

The Sanderson Hotel refurbishment, London, UK

1 January 0001

In the heart of Central London, just off Oxford Street, housed within a former fabric and car showroom, The Sanderson is a grade A listed building.

Case Study

The Blue Boar Smokehouse Bar InterContinental Hotel, London

1 January 0001

One of the newest additions to Westminster in 2012 dining scene is the Blue Boar Smokehouse & Bar in the InterContinental Hotel. Fitted out by ISG to deliver an American inspired British dining experience, the finished environment is one that fits this concept whilst maintaining the hotel’s high quality finish

Case Study

InterContinental Westminster Hotel fit out, London, UK

1 January 0001

ISG successfully completed a turnkey programme in delivering the new InterContinental London Westminster in just 39 weeks on behalf of the developer Supreme Hotels.

Case Study
Imperial build e - thumbnail

The Sir Michael Uren Hub, London, UK

1 January 0001

The Sir Michael Uren Hub is one of the flagship buildings at Imperial College London’s White City Campus, a new 23-acre district dedicated to research and innovation in science, engineering, medicine and business.

Case Study

The Goring Hotel refurbishment and restoration, London, UK

1 January 0001

ISG was chosen to refurbish and restore the family heritage of The Goring Hotel. We carried out three separate projects across the grand old hotel comprising the refurbishment of the restaurant, sitting room, bar, terrace and bedroom suites.

Page 1

Page: 1 2 3 4