Case studies

Showing 1-10 of 35

View: Global site All sites Current site

Case Study

The Savoy Grill fit out, London, UK

1 January 0001

Celebrity chef and Michelin Star winner Gordon Ramsay reappointed ISG for circa £600,000 fit out of the Savoy Grill. Located on The Strand, the grill was designed to seat approximately 130 diners in modern comfort without losing any of the charm that the Savoy Grill has long been famous for.

Case Study
united airlines

United Airlines Terminal 2 fit out, Heathrow, UK

1 January 0001

We were chosen by United Airlines to fit out their Club Lounge facilities. Heathrow’s new Terminal, 2B was completed in spring 2014, with the lounge at Terminal T2A still currently on site.

Case Study

Bread Street Kitchen fit out, London, UK

1 January 0001

The multi-million pound, awarding-winning fit out project comprised of the installation of both a lift and a dramatic, 8.5 metre-high feature staircase. We also constructed a blackened steel and brass mesh, which incorporates viewing platforms looking out over the ground floor wine bar.

Case Study

NHS Foundation Endoscopy Unit conversion, London, UK

1 January 0001

Endoscopy Unit

Case Study
ShangriLa

Shangri-La Hotel spa gymnasium construction, Kuala Lumpur, Malaysia

1 January 0001

ISG provided the construction services for the new Spa and Gymnasium with the Sultan Ismail Shangri-La. This marked a significant upgrade for the hotel, transforming it into a five star facility.

Case Study
Lancaster hotel

Lancaster Hotel refurbishment, London, UK

1 January 0001

The Lancaster refurbishment project was one the most expansive our team has undertaken to date. With sufficient facilities to host 1,800 people across two rooms, it also comprises enough rooms to accommodate over 1,000 people per night.

Case Study
Avitar hotel

Aviator Hotel fit out, Farnborough, UK

1 January 0001

This sleek hotel has been created for the international business community flying to and from TAG London Farnborough Airport. It has also been constructed for the many hi-tech, defence and aerospace companies located in the hotel’s vicinity

Case Study
Zetter ISG fit out thumbnail

The Zetter Hotel

1 January 0001

Tasked with a substantial refurbishment of a historic building, our team began transforming the Victorian warehouse building in Clerkenwell into an environmentally friendly boutique hotel demonstrating style, comfort, and personality.

Case Study

The Sanderson Hotel refurbishment, London, UK

1 January 0001

In the heart of Central London, just off Oxford Street, housed within a former fabric and car showroom, The Sanderson is a grade A listed building.

Case Study
Elken Elysyle

Elken Elysyle Spa construction, Bangunan Elken, Kuala Lumpur

1 January 0001

Built to the design of the renowned Japanese Deep Design Co, the Elken Elysyle Spa has been identified as one of the highest quality spas in Malaysia. With a gross floor area approaching 10,000 sq ft the spa’s services are comprehensive and the design incorporates a number of Zen architectural design principles. These include the waterfall in the registration area and the river-step feature in the central areas.

Page 1

Page: 1 2 3 4