Case studies

Showing 1-10 of 25

View: Global site All sites Current site

Case Study
Cell Therapy Catapult

Cell and Gene Therapy Catapult fit out, London, UK

9 March 2020

Cell and Gene Therapy Catapult is a place where academics, businesses and clinicians, with a special interest in cell therapies, work together to focus on the commercial development of cutting-edge technologies in cell therapy.

Case Study
Newmarket ambulance

Ambulance station, Newmarket, UK

1 January 0001

This project was for the construction of a new ambulance station. It was procured on a design & build basis with the client’s input, and became a flagship design for new ambulance stations in East Anglia.

Case Study
esporta

Esporta construction, UK

1 January 0001

ISG have delivered numerous Esporta Health Clubs around the UK including Chiswick, Gloucester, London, Oxford, Finchley, Sheffield and Repton Park. One of the most notable projects was the Gloucester Club which was built on a brown field site.

Case Study
David Lloyd

David Lloyd construction, UK

1 January 0001

We have delivered 12 clubs for David Lloyd including, the complex project in London’s West End at PointWest in Cromwell. The project was surrounded on three sides by tube lines yet we were required to build underground and on top of a Sainsbury’s supermarket.

Case Study
Royal college of surgeons

The Royal College of Surgeons technical fit out, London, UK

1 January 0001

The Royal College of Surgeons of England is an independent charity committed to promoting and advancing the highest standards of surgical care for patients in England and Wales.

Case Study
Sackville house

Sackville House cosntruction, Cambridgeshire, UK

1 January 0001

Sackville House was developed to provide a range of public services under one roof for the people of Cambourne. It is a one-stop shop for local authority and health services and includes a health centre, library and headquarters for Cambridgeshire County Council’s Trading Standards division.

Case Study
Ridge medical centre

Ridge Medical Practice construction, Bradford, UK

1 January 0001

This project was for the construction of a new medical centre on a disused, derelict site, replacing a nearby GP surgery that was too small to meet the local community’s demands.

Case Study
Royal Hallamshire

Royal Hallamshire Hospital, Sheffield

1 January 0001

This fast-track project was for the strip out and reconfiguration of ward accommodation to form an endoscopy decontamination unit and two operating theatres as well as circulation areas.

Case Study
Leyton_Lesiure_Centre

Leyton Leisure Centre refurbishment, London, UK

1 January 0001

This project was part of a £25 million four-year framework to redevelop the leisure facilities for the London Borough of Waltham Forest.

Case Study

Royal Free Hospital Institute of IIT refurbishment, London, UK

1 January 0001

Institute of IIT

Page 1