Case studies

Showing 1-10 of 65

View: Global site All sites Current site

Case Study
Cell Therapy Catapult

Cell and Gene Therapy Catapult fit out, London, UK

9 March 2020

Cell and Gene Therapy Catapult is a place where academics, businesses and clinicians, with a special interest in cell therapies, work together to focus on the commercial development of cutting-edge technologies in cell therapy.

Case Study

NHS Foundation Endoscopy Unit conversion, London, UK

1 January 0001

Endoscopy Unit

Case Study

Watches of Switzerland fit out, London, UK

1 January 0001

This was our first project for the Watches of Switzerland in the UK, and it was one ISG was very excited to deliver.

Case Study

Cameron House Fit Out, Loch Lomond, Scotland

1 January 0001

Cameron House, a luxury five-star hotel in Scotland, tasked ISG with upgrading and expanding its accommodation and conference facilities.

Case Study
Astex thumbnail - ISG

Astex Therapeutics Fit Out, Cambridge, UK

1 January 0001

ISG undertook a circa £2.3 million refurbishment project converting an existing office and laboratory space into new world-class facilities for the leading Cambridge biotechnology company, Astex Therapeutics.

Case Study
The Toy Store

The Toy Store fit out, London, UK

1 January 0001

ISG’s UK team has successfully delivered a full fit out of The Toy Store’s first flagship outlet in the UK, in the heart of London, Oxford Street.

Case Study
Le Meridien Hotel Presidential Suite - ISG

Le Meridien, Kuala Lumpur, Malaysia

1 January 0001

ISG was appointed to carry out refurbishment works for Le Meridien. Our improvement to the systems at Le Meridien in Kuala Lumpur has seen the hotel enjoy substantial connectivity advancements.

Case Study
20 Old Bailey construction London - ISG

20 Old Bailey

1 January 0001

ISG has provided 360,000 sq ft of central London office accommodation for Blackstone, located at 20 Old Bailey – opposite the world-famous law courts.

Case Study
Skype

International Fashion House fit out, London, UK

1 January 0001

We delivered a fast-track project for an international fashion house. The scheme encompassed the high specification fit out of the entire building for their new central London office base in Westminster.

Case Study
RIBA NORTH national architecture centre - exterior - ISG

RIBA North national architecture centre fit out

1 January 0001

ISG was awarded the prestigious fit-out scheme for RIBA’s new national architecture centre on the Liverpool Waterfront in 2015.

Page 1

Page: 1 2 3 4 5 6 7