Case studies

Showing 1-10 of 78

View: Global site All sites Current site

Case Study
Marlowe theatr

New Marlowe Theatre construction, Canterbury, UK

31 March 2011

This important regional arts scheme saw us demolish the existing theatre building, whilst retaining the fly tower, and creating a new enlarged theatre and performing arts facility.

Case Study
Hampden

Hampden Park construction, Glasgow, UK

1 January 0001

ISG was instructed to extend and upgrade the North, East and West stands at Hampden Park. The project improved spectator facilities and accessibility by providing additional concourse area, catering facilities, lifts and new toilets in the North Stand.

Case Study
Chester town hall

Chester Town Hall internal refurbishment, Chester, UK

1 January 0001

The project was awarded via the North West Construction Hub (NWCH) Medium Value Framework. The four-year framework will see us working across the entire North West region delivering council projects valued between £500K and £10 million.

Case Study
Linkwood

Linkwood Distillery construction, Elgin, UK

1 January 0001

The Linkwood distillery was originally established in the first half of the 19th century. It produces single malt whisky used in well-established blended whiskies.

Case Study

Saffron Walden County High School construction, Saffron Walden, UK

1 January 0001

We built a multi-purpose state-of-the-art auditorium at Saffron Walden County High School and extended the existing sixth form accommodation.

Case Study

Aston by Sutton Primary School construction, Cheshire, UK

1 January 0001

This project for Aston by Sutton Primary School was carried out as part of the North West Construction Hub Medium Value Framework.

Case Study

St. Martins Primary School design and build, Exeter, UK

1 January 0001

An established and successful relationship with our client led to our selection for this design and build project. Working from our model, the highly sustainable school and multi-purpose centre are the benchmark for the new community development.

Case Study
Harris Girls Academy

Harris Girls Academy construction, East Dulwich, UK

1 January 0001

Our client required a complete renovation of the existing building into a brighter, more contemporary learning environment, flexible enough for future needs. The work needed to be completed during the summer holiday period and ready for the new academic year

Case Study
Nido_Thumbnail2

Nido Notting Hill new build, London, UK

1 January 0001

Following the success of our major project at Nido Spitalfields, completed in August 2010, we secured the new build of the 272 bed Nido Notting Hill scheme.

Case Study

Hitherfield Primary School Design and Build, Streatham, UK

1 January 0001

This design and build project with the London Borough of Lambeth was to extend and alter Hitherfield Primary School from a two form entry school, to a three form entry school.

Page 1

Page: 1 2 3 4 5 6 7 8